• Resources
  • KP Engineering To Provide Detailed Engineering Services For Gasoline Blending Project

July 08, 2016

KP Engineering To Provide Detailed Engineering Services For Gasoline Blending Project

KP Engineering will prepare engineering design packages for a Southwest Refiner that define the modifications required to the refinery’s blending system to facilitate the load out of regular and premium gasoline. The detailed engineering work is expected to take three months to complete.